The TR1 is the document that ties special inspections to your permit. A plain-language walkthrough of the form, the signatures and the common mistakes.
Read more →
The TR1 is the document that ties special inspections to your permit. A plain-language walkthrough of the form, the signatures and the common mistakes.
Read more →
Every special inspection category on the NYC TR1, grouped by trade, with what to send the agency before day one, when to call, and what you need for the Certificate of Occupancy. Printable PDF.
Read more →
Not every inspection agency can sign off on every job. Here is what the DOB classes mean, and why it matters before your first pour.
Read more →Send the project details and we call you back within the hour during office hours (Mon–Fri, 7 AM–4:30 PM ET).